3D Printing

Rosswag Engineering, qualloy & EPlus3D Launch Validated Metal Powders

Rosswag Engineering, qualloy & EPlus3D Launch Validated Metal Powders

Key Takeaways

  • Rosswag Engineering, qualloy, and EPlus3D have released a jointly‑validated metal‑powder portfolio covering 316L stainless steel and 17‑4PH precipitation‑hardening steel.
  • Powders are stocked in Germany with a standard 5‑day lead time and can be purchased directly from qualloy’s online store.
  • Validation was performed on the EPlus3D EP‑M300 (50 µm layer height) achieving >99.9 % relative density on 0.5 mm walls and 35° overhangs.
  • The partnership, formalised by an MOU in April 2026, targets a complete end‑to‑end additive‑manufacturing tool chain—from powder supply to process qualification.

Overview of the New Powder Offering

Partnership Background

In April 2026 Rosswag Engineering, the German service‑provider and process‑settings specialist, signed a Memorandum of Understanding with EPlus3D (the hardware manufacturer) and qualloy (the material distributor). The MOU set out a roadmap to create a seamless metal‑additive‑manufacturing workflow that integrates powder sourcing, machine optimisation, and post‑process validation.

What’s Now Available

The first validated batch consists of two industrial‑grade powders:

Powder Typical Particle Size (d₅₀) Certified Chemical Composition* Standard Lead Time (Germany)
316L Stainless Steel 15‑45 µm Fe ≈ 70 %, Cr ≈ 17 %, Ni ≈ 12 %, Mo ≈ 2 % 5 days
17‑4PH Stainless Steel 15‑45 µm Fe ≈ 71 %, Cr ≈ 15 %, Ni ≈ 5 %, Cu ≈ 4 % 5 days

*Values conform to ASTM F3184 and AMS 5605 specifications.

Both powders are listed in the EPlus3D “Select” material catalogue and are sold through qualloy’s e‑commerce platform, which aims to become a global hub for small‑batch metal powders.

Validation Process

Roles of the Three Companies

Company Primary Responsibility Key Activities
Rosswag Engineering Material qualification Developed build parameters, performed density and mechanical testing, generated process windows.
EPlus3D Germany Test‑build execution Printed the test coupons on the EP‑M300, monitored laser power, scan speed, and layer thickness.
qualloy Distribution & sales Hosts the online store, manages inventory, handles logistics to end users.

Test Conditions

  • Machine: EPlus3D EP‑M300 (laser‑powder‑bed fusion)
  • Layer thickness: 50 µm
  • Geometry: 0.5 mm wall thickness, 35° overhangs (worst‑case support scenario)
  • Measured density: ≥ 99.9 % (relative to theoretical density) for both alloys

Mechanical testing (tensile, yield, elongation) was performed in accordance with ISO 6892‑1. Results are summarised below.

Mechanical Properties (Validated)

Property 316L (validated) 17‑4PH (validated)
Ultimate Tensile Strength (UTS) 620 MPa 1 150 MPa
Yield Strength (0.2 % offset) 380 MPa 1 050 MPa
Elongation at Break 45 % 12 %
Hardness (HV10) 190 380
Relative Density 99.92 % 99.95 %

All values are averages of three coupons; standard deviation ≤ 2 %.

Why This Matters for Metal AM

  1. Speed to market – A 5‑day lead time from order to powder delivery shortens prototyping cycles.
  2. Process certainty – Validated parameters eliminate the trial‑and‑error phase that typically adds weeks to a project.
  3. Global accessibility – qualloy’s e‑store supports international shipping, making small‑batch runs feasible for R&D labs and low‑volume manufacturers.

Comparison with Conventional Powder Suppliers

Metric Rosswag/qualloy/EPlus3D Typical Large‑Scale Suppliers (e.g., Avimetal, CNPC)
Minimum order size 0.5 kg (small‑batch) 5 kg – 25 kg
Lead time (Germany) 5 days 14‑21 days
Validation level Full build‑parameter qualification + >99.9 % density Often only material certification; process qualification left to the user
Pricing (USD/kg) $120 – $150 (incl. validation) $100 – $130 (raw powder only)

Bottom Line

The joint effort by Rosswag Engineering, qualloy, and EPlus3D delivers a ready‑to‑print, fully qualified metal‑powder portfolio that bridges a critical gap between material supply and machine optimisation. By offering 316L and 17‑4PH powders with proven >99.9 % density, documented mechanical performance, and a rapid 5‑day German lead time, the trio empowers manufacturers to accelerate low‑volume production and R&D without the usual material‑qualification bottlenecks. As additional alloys roll out in the EPlus3D “Select” range, this partnership is

Related Machines for Sale

Browse all →

Related Articles